Wateree
Station Hot/Cold Steam Lines
SCE & G was replacing the steam lines in unit
one. We measured the location of the lines utilizing
traditional survey methods when scaffolding was in
place. After the lines were constructed, we scanned them
for placement and movement when hot and cold.
Grace Episcopal Church,
Charleston, SC
We were hired by the architect and engineer to scan
the church that was built in 1875 to check for movement
and tilt of the steeple. Ultimately we have scanned most
of the church for design of structural members to be
place in the walls to shore them up and to place the
steeple back in position and shore it up.
Statue at Carter-Finley
Stadium, Raleigh, NC
The structural engineers retained us to scan a model
of the statue and make sections to scale in order to
design the structural steel.
|